Analisis scheduling pengerjaan reinforcement fuselage pesawat N219 menggunakan metode program evaluation and review technique (PERT) PT. Dirgantara Indonesia

agus priyono, uyuunul mauidzoh, marni astuti

Abstract


One of the successes or failures of a project is influenced by project scheduling and control planning, less effective scheduling results in delays and the emergence of problems during project work, this requires good scheduling to regulate work activities, therefore determining the critical path of activities is needed to Set the time for the work to go according to plan. In this study, the focus is on scheduling the reinforcement fuselage for the aircraft N219 PT. Dirgantara Indonesia, using the Program Evaluation And Review Technique (PERT) method to determine the critical path of activity and calculate the most likely completion time of the reinforcement fuselage work. The results of the research analysis on the main schedule for the reinforcement fuselage work obtained a critical path with the activity code A – B – D – E – G, Development Problem Log (DPL) scheduling analysis obtained critical path A1 – B1 – C1 – E1 – F1, A2 – B2 – C2 – D2, A3 – B3 – D3 – E3, A4 – B4 – C4 – D4, A5 – B5 – C5 – D5 – E5, A6 – B6 – C6 – D6 – E6. And the most likely completion time for the reinforcement fuselage work is 40-45 days with a probability value of 95.72% - 99.88%.


Keywords


project scheduling, Program Evaluation And Review Technique (PERT), critical path, project time

References


Kurniawan, Fajar.2020, Analisis Waktu Pelaksanaan Proyek Dengan Menggunakan Metode Cpm – Pert Pada Pembangunan Gedung Sdn Bibis 113 Surabaya. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Soeharto, Iman.1999, Management Proyek, Edisi kedua, Anggota IKAPI, Erlangga, Jakarta.

Nugroho A. A.2020, Schedule Reinforcement Fuselage Pesawat N219, PT. Dirgantara Indonesia, Bandung.

Husen, Abrar.2009. Manajemen Proyek, Perencanaan, Penjadwalan Dan Pengendalian Proyek, penerbit andi, Yogyakarta.

Kusnanto.2010, Penjadwalan Pyoyek Kontruksi Dengan Metode Pert (Studi Kasus Proyek Pembangunan Gedung Ruang Kuliah Dan Perkuliahan PGSD Kleco FKIP UNS Tahap 1),Skripsi, Jurusan Teknik Sipil, Universitas Sebelas Maret. Surakarta.




DOI: http://dx.doi.org/10.28989/senatik.v7i0.466

Article Metrics

Abstract view : 135 times
PDF (Bahasa Indonesia) - 58 times

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Conference SENATIK P-ISSN :2337-3881 and  E-ISSN : 2528-1666

Jumlah penggunjung = Web Analytics orang

Statistik Senatik

Flag Counter